Three. After rig positioning, generate the casing into the ground. Push metal casing into a least a depth of one m beneath the ground amount to just take lateral loads and actions at site. The metal casing also overcome complications as a result of groundwater during piling. In such a https://cast-in-situ-piles-in-dha84566.blogsmine.com/33061098/detailed-notes-on-cast-in-situ-piles