A full redo was not inside their budget, Nevertheless they decided to make the space only a bit "a lot less uncomfortable." Refinishing all the things from the plywood subfloor to the first sink fixtures with paint, this spending plan bathroom remodel was done in about four weekends. Tom Schmoe http://bathroom-remodel-cost-san74173.ampblogs.com/Getting-My-kitchen-and-bath-remodeling-To-Work-39347853